Abstract: 110kV power grid for the online contact one end of the blackout, the original substation devices prepared from the vote since the vote can not achieve the distance function, leading to some of 110kV substation and one end of the 220kV substation site-wide blackout. Study on a use of existing fiber-optic communication channel information transmission operation, fault information and jump Reclosing command standby power mode of the program since the vote. Prepared through the transformation of the original cast from the device, increasing the number of voting logic program, the installation of fiber optic communications modules, implementation of the interface with the fiber-optic network. Handan City in Hebei Province by the 110kV grid in the application and implementation, good implementation of the tandem distance standby power grid since the vote.
Key words: 110kV power grid The distance from the vote Fiber Since the distance preparing to vote
[1]、呂新東,羅立波,姜東飛,遠方備自投淺議,新疆電力,2003,2,35-37 Lv Xin-dong,Luo Li-bo,Jiang Dong-fei, Prepared to vote on the distance from , Xinjiang Electric Power,2003,2,35-37
[2]、陶軍,李衛(wèi)國,洪天炘,通信串口在遠方備自投上的應(yīng)用,安徽電力職工大學學報,2003, 8(3),12-15 Tao Jun,Li Wei-guo,Hong Tian-xin, Preparation of serial communications at the distance from the vote on the application of, Anhui University of electricity workers,2003,8(3),12-15
[3]、王銳,李釗,許元戎,高壓電網(wǎng)自適應(yīng)站間實時自控備自投裝置的研制,繼電器,2007,35(19),45-48 Wang Rui,Li Zhao,Xu Yuan-rong,Adaptive inter-station high-voltage power grids prepared from the cast of real-time control device,Relay,2007,35(19),45-48
[4]、唐海軍,基于光纖通信的遠方備自投設(shè)計與實現(xiàn),繼電器,2006,34 (4),80-82 Tang Hai-jun, Optical fiber communication based on the distance from the cast prepare the design and implementation,Relay,2006,34(4),80-82
[5]、劉繼安,王書杰,江艦,電網(wǎng)備自投穩(wěn)控裝置在電網(wǎng)中的研發(fā)應(yīng)用,2007,35(19),42-44 Liu Ji-an,Wang Shu-jie,Jiang Jian, Preparation of self-cast grid stability control equipment at power grid in the R & D Applications,2007,35(19),42-44